Home » The Old Manor Garden, Video Blogs » First load of ready mixed concrete

First load of ready mixed concrete

Follow the building of  ”The Old Manor Garden“ at Capel Manor College.
Phase 1 to be completed by June 2010 will see the construction of a church (ruins) and cloister garden, wildlower meadow, moat, swimming pond and a bog garden.

Its December 16th and diggers have dug out the foundations for the Church and the first delivery of ready mixed concrete is poured.

Get the Flash Player to see the wordTube Media Player.
Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • Google
  • StumbleUpon
  • TwitThis
  • Live
  • MySpace
  • Reddit
  • LinkedIn
  • NewsVine
  • Yahoo! Buzz
  • Print this article!
  • E-mail this story to a friend!
http://www.capelmedia.co.uk/?p=561

Leave a comment